PHASE DESIGN AND BUILD LTD
CopyKey Data
Status
Company No.
Incorporation date
Size
Classification
Contacts
Registered address
Total Assets
No recordsNumber of employees
No recordsCash in Bank
No recordsConfirmation
Accounts
Financial Ratios
No financial ratios available
This company has not submitted financial statements or the data is not publicly available. Please check back later – the information may be updated.
People
Officers
Person | Title | Period | Connections |
|---|---|---|---|
Bunkum, Luke James | Director | 30/10/2024 - Present | - |
Selleck, Matthew James | Director | 30/10/2024 - Present | 2 |
Persons with Significant Control
Similar companies
Category:
Post-harvest crop activitiesComp. code:
03185729Reg. date:
15/04/1996Turnover:
-No. of employees:
-Category:
Silviculture and other forestry activitiesComp. code:
12543378Reg. date:
01/04/2020Turnover:
-No. of employees:
-Category:
Mixed farmingComp. code:
SC127217Reg. date:
12/09/1990Turnover:
-No. of employees:
-Category:
Growing of other non-perennial cropsComp. code:
SC278017Reg. date:
06/01/2005Turnover:
-No. of employees:
-Category:
Mixed farmingComp. code:
02153348Reg. date:
07/08/1987Turnover:
-No. of employees:
-Description
About PHASE DESIGN AND BUILD LTD
PHASE DESIGN AND BUILD LTD is an(a) Active company incorporated on 30/10/2024 with the registered office located at 43 Florence Park, Callington PL17 8FJ. There are currently 2 active directors according to the latest confirmation statement. Number of employees Unknown.Frequently Asked Questions
What is the current status of PHASE DESIGN AND BUILD LTD?
PHASE DESIGN AND BUILD LTD is currently Active. It was registered on 30/10/2024 .
Where is PHASE DESIGN AND BUILD LTD located?
PHASE DESIGN AND BUILD LTD is registered at 43 Florence Park, Callington PL17 8FJ.
What does PHASE DESIGN AND BUILD LTD do?
PHASE DESIGN AND BUILD LTD operates in the Construction of domestic buildings (41.20/2 - SIC 2007) sector.
What is the latest filing for PHASE DESIGN AND BUILD LTD?
The latest filing was on 04/11/2025: Confirmation statement made on 2025-10-29 with no updates.